Layher
Jump to navigation
Jump to search
- SpeedyScaf (0.73 or 1.09 m) 6 component: base plate, diagonal brace, assembly frame, scaffolding deck, toe board and guardrail.
- Allround Shoring Frame TG 60 (up to 6T). According to grok ~1K for a 2 meter tower.
Related[edit]
See also[edit]
Advertising: